Data Centers in Missouri, United States
Tracked campuses, energy records and mapped sites, with sources.
1 tracked campus (1 operating), 0 energy records and 8 sites mapped in OpenStreetMap. Megawatts keep the basis each source used and are never added across bases.
Open Missouri, United States on the map →Tracked campuses
| Campus | For | Status | Full build |
|---|---|---|---|
| Google Kansas City East Kansas City, Missouri | Operating | 105 MW IT power · Epoch AI estimate |
Records marked Epoch AI estimate come from Epoch AI, "AI data centers" (epoch.ai/data/ai-data-centers), used under the Creative Commons Attribution license. They are not operator statements.
Mapped sites
Data centers mapped in OpenStreetMap as of 2026-11-17, beyond the tracked campuses. Each has a name or an operator and a place, and nothing else on the record.
- CenturyLinknear Cameron, Missouri, United States · Built
- Carfaxnear Columbia, Missouri, United States · Built
- MasterCard data centerMasterCard · near Dardenne Prairie, Missouri, United States · Build state not read
- Patmos Hosting, Inc. data centerPatmos Hosting, Inc. · near Kansas City, Missouri, United States · Built
- AT&T data centerAT&T · near Kirksville, Missouri, United States · Built
- Black Rock Financial Managementnear Parkville, Missouri, United States · Built
- Meta Data CenterMeta · near Smithville, Missouri, United States · Built
- Genome Data CenterWashington University in St. Louis · near St. Louis, Missouri, United States · Build state not read
Mapped sites: © OpenStreetMap contributors, Open Database License, pulled 2026-11-17; campus grouping from datacenter-land. Nearest city from GeoNames (CC BY 4.0); states and provinces from Natural Earth. Coverage depends on volunteer mapping and is thin in parts of Asia and Africa: a low count is not a small market.