Skip to main content
    Thursday, November 26, 2026

    Data Centers in Texas, United States

    Tracked campuses, energy records and mapped sites, with sources.

    17 tracked campuses (9 operating, 8 under construction), 0 energy records and 65 sites mapped in OpenStreetMap. Megawatts keep the basis each source used and are never added across bases.

    Open Texas, United States on the map →

    Tracked campuses

    CampusForStatusFull build
    Stargate Abilene
    Abilene, Texas
    OpenAI (Oracle-operated)Operating1.2 GW
    facility power
    Stargate Shackelford County
    Shackelford County, Texas
    OpenAI (Oracle-operated)Under construction2 GW
    facility power
    Stargate Milam County
    Milam County, Texas
    OpenAI (SoftBank-owned hardware)Under construction1.2 GW
    facility power
    Google Wilbarger County
    Wilbarger County, Texas
    GoogleUnder constructionnot stated
    basis not stated
    Meta El Paso
    El Paso, Texas
    MetaUnder construction1 GW
    basis not stated
    Project Matador
    Carson County, Texas
    TensorWave (first lease)Under constructionnot stated
    basis not stated
    Anthropic Barber Lake
    Colorado City, Texas
    AnthropicUnder construction207 MW
    IT power · Epoch AI estimate
    CoreWeave Denton TX
    Denton, Texas
    OpenAIOperating282 MW
    IT power · Epoch AI estimate
    Coreweave Helios
    Afton, Texas
    CoreWeaveOperating528 MW
    IT power · Epoch AI estimate
    Crusoe Abilene Expansion
    Abilene, Texas
    MicrosoftUnder construction672 MW
    IT power · Epoch AI estimate
    Goodnight
    Claude, Texas
    GoogleUnder construction1.0 GW
    IT power · Epoch AI estimate
    Google Midlothian
    Midlothian, Texas
    GoogleOperating103 MW
    IT power · Epoch AI estimate
    Google Red Oak
    Red Oak, Texas
    GoogleOperating154 MW
    IT power · Epoch AI estimate
    Meta Temple
    Temple, Texas
    MetaOperating178 MW
    IT power · Epoch AI estimate
    Microsoft SAT14
    San Antonio, Texas
    MicrosoftOperating47 MW
    IT power · Epoch AI estimate
    Microsoft SAT40
    San Antonio, Texas
    MicrosoftOperating75 MW
    IT power · Epoch AI estimate
    Vantage TX1
    San Antonio, Texas
    Not reportedOperating128 MW
    IT power · Epoch AI estimate

    Records marked Epoch AI estimate come from Epoch AI, "AI data centers" (epoch.ai/data/ai-data-centers), used under the Creative Commons Attribution license. They are not operator statements.

    Mapped sites

    Data centers mapped in OpenStreetMap as of 2026-11-17, beyond the tracked campuses. Each has a name or an operator and a place, and nothing else on the record.

    Showing 60 of 65. See all on the map.

    Mapped sites: © OpenStreetMap contributors, Open Database License, pulled 2026-11-17; campus grouping from datacenter-land. Nearest city from GeoNames (CC BY 4.0); states and provinces from Natural Earth. Coverage depends on volunteer mapping and is thin in parts of Asia and Africa: a low count is not a small market.

    Powered by KokoAI