    Reported figures, sources and what changed.

    Operating · Asia-Pacific

    Bridge Data Centres MY06

    Sedenak, Johor, Malaysia

    Full build
    243 MW (IT power)
    Reported operating
    243 MW (IT power)
    For
    ByteDance
    Built by
    ByteDance
    Investment
    not stated
    Investors
    Power
    Not reported.
    Timing
    Epoch AI dates the first capacity to December 2022. Epoch AI's latest entry, September 13, 2026: "No visible construction work on Buildings 8-10, but no cars in their carparks either (whereas Building 7 has many cars)."
    Jobs
    not stated
    Community
    not stated
    Contested
    not recorded in this snapshot; absence is not evidence of no dispute
    AI tie
    Chip types Epoch AI lists: A100, H100 and B200.
    Record type
    Third-party estimate from Epoch AI (CC BY). Not read from an operator's own statement.
    Note
    Third-party estimate. Epoch AI reads IT power from satellite imagery, permits and public documents; the operator has not confirmed these figures. Epoch AI's confidence: ByteDance as owner is marked likely; ByteDance as user is marked likely. Epoch AI estimates 315 MW of total facility power for the same date; the register keeps the IT power figure. Epoch AI models the capital cost to date at about $9.2 billion in 2025 dollars, calculated from IT power; it is not a stated investment.

    Evidence and delivery dependencies

    • Metric-level verification not recorded

    Diligence sequence: power agreement → load connection → permits → equipment → building → fit-out → commissioning. Completion of each dependency is unverified unless the linked evidence explicitly establishes it.

    Sources

    What changed

    No changes recorded since November 20, 2026.

    First recorded on November 20, 2026. "Recorded" is the day a change was entered here, not the day it happened. Tracked: name, tenant, status, capacity and what it counts, and stated investment. Changes to other fields, such as sources, timing and power, are not listed.