    Every tracked AI campus, with its sources and what changed.

    Every tracked AI campus has a page of its own with its reported figures, its sources and what changed. Megawatts keep the basis each source used and are never added across bases.

    Recent changes to tracked campuses

    1. Recorded : Digital Realty UK AI mega-campus. Removed from the register.
    2. Recorded : Microsoft India South Central region. Status changed from under construction to operating. A source added to the record the same day (it may support a different field): DCD — Microsoft launches India South Central cloud region in Hyderabad, dated .
    3. Recorded : Stargate Abilene. Operating capacity basis changed from facility power to basis not stated. A source added to the record the same day (it may support a different field): Epoch AI — OpenAI Stargate Abilene (site timeline, latest entry 2026-11-01), dated .
    4. Recorded : Stargate Abilene. Operating capacity changed from 300 MW (facility power) to 618 MW (basis not stated). A source added to the record the same day (it may support a different field): Epoch AI — OpenAI Stargate Abilene (site timeline, latest entry 2026-11-01), dated .
    5. Recorded : Stargate Lordstown. Status changed from announced to under construction. A source added to the record the same day (it may support a different field): Epoch AI — OpenAI Stargate Lordstown (site timeline, latest entry 2026-07-30), dated .
    6. Recorded : Stargate Lordstown. Full-build capacity changed from 300 MW (facility power) to not reported. Latest source on the record at the time (it may not be the source of this change): Epoch AI — OpenAI Stargate: where the US sites stand, dated .Editor's note: The source gives an upper bound of less than 300 MW, not an exact figure. The exact value is withheld and the bound is kept in the record's notes: a bound is not converted to a measurement.

    Changes to a campus already in the register, newest first, since October 16, 2026. "Recorded" is the day a change was entered here, not the day it happened. Newly added campuses and recordkeeping changes are listed on each campus's own page.

    All tracked campuses (120)

    CampusPlaceStatusFull build
    AirTrunk TOK1Chiba, JapanOperating300 MWbasis not stated
    Alibaba ZhangbeiHebei, ChinaOperating169 MWIT power
    Amazon Madison Mega SiteMississippi, United StatesOperating683 MWIT power
    Amazon Project RainierIndiana, United StatesOperating2.2 GWbasis not stated
    Amazon RidgelandMississippi, United StatesOperating840 MWIT power
    Anthropic Barber LakeTexas, United StatesUnder construction207 MWIT power
    Anthropic Lake MarinerNew York, United StatesOperating378 MWIT power
    AWS BerwickPennsylvania, United StatesOperating169 MWIT power
    AWS New AlbanyOhio, United StatesOperating338 MWIT power
    AWS Peru regionLima, PeruAnnounced40 MWbasis not stated
    Bridge Data Centres MY06Johor, MalaysiaOperating243 MWIT power
    Campus AI (MGX · Mistral) Île-de-FranceÎle-de-France, FrancePlanned1.4 GWbasis not stated
    CDC Marsden ParkNew South Wales, AustraliaUnder construction504 MWIT power
    Colossus 1Tennessee, United StatesOperating340 MWIT power
    Core42 Lake MarinerNew York, United StatesOperating58 MWIT power
    CoreWeave Chester VAVirginia, United StatesOperating113 MWIT power
    CoreWeave Dalton 1 & 2Georgia, United StatesOperating28 MWIT power
    CoreWeave Denton TXTexas, United StatesOperating282 MWIT power
    CoreWeave Ellendale NDNorth Dakota, United StatesOperating400 MWIT power
    Coreweave HeliosTexas, United StatesOperating528 MWIT power
    CoreWeave Lancaster Greenfield sitePennsylvania, United StatesUnder construction92 MWIT power
    CoreWeave Marble NCNorth Carolina, United StatesOperating65 MWIT power
    CoreWeave Muskogee OKOklahoma, United StatesUnder construction153 MWIT power
    CoreWeave NorwayAgder, NorwayOperating42 MWIT power
    Crusoe Abilene ExpansionTexas, United StatesUnder construction672 MWIT power
    CyrusOne FRA7Hesse, GermanyUnder construction81 MWIT power
    Data Center Valley, EkibastuzPavlodar Region, KazakhstanUnder construction1 GWbasis not stated
    DayOne KempasJohor, MalaysiaOperating422 MWIT power
    DayOne NusajayaJohor, MalaysiaOperating473 MWIT power
    Echelon DUB10County Dublin, IrelandUnder construction90 MWIT power
    EcoDataCenter 2Dalarna, SwedenUnder construction48 MWIT power
    Envision Galaxy UlanqabInner Mongolia, ChinaOperating470 MWIT power
    Equinix SP7 São PauloSão Paulo, BrazilPlanned14 MWbasis not stated
    GoodnightTexas, United StatesUnder construction1.0 GWIT power
    Google AI Hub VisakhapatnamAndhra Pradesh, IndiaUnder construction1 GWbasis not stated
    Google ArcolaVirginia, United StatesOperating77 MWIT power
    Google BristowVirginia, United StatesOperating238 MWIT power
    Google Cedar RapidsIowa, United StatesUnder construction261 MWIT power
    Google ColumbusOhio, United StatesOperating386 MWIT power
    Google Council Bluffs (East)Iowa, United StatesOperating237 MWIT power
    Google Fort WayneIndiana, United StatesUnder construction863 MWIT power
    Google Kansas City EastMissouri, United StatesOperating105 MWIT power
    Google LancasterOhio, United StatesOperating137 MWIT power
    Google LincolnNebraska, United StatesOperating283 MWIT power
    Google MesaArizona, United StatesOperating183 MWIT power
    Google MidlothianTexas, United StatesOperating103 MWIT power
    Google New AlbanyOhio, United StatesOperating333 MWIT power
    Google OmahaNebraska, United StatesOperating395 MWIT power
    Google PapillionNebraska, United StatesOperating237 MWIT power
    Google Pryor (North)Oklahoma, United StatesOperating368 MWIT power
    Google Red OakTexas, United StatesOperating154 MWIT power
    Google Storey CountyNevada, United StatesOperating300 MWIT power
    Google The DallesOregon, United StatesOperating154 MWIT power
    Google Waltham CrossEngland, United KingdomOperating88 MWIT power
    Google Wilbarger CountyTexas, United StatesUnder constructionnot stated
    Homer City Energy CampusPennsylvania, United StatesUnder construction4.5 GWbasis not stated
    Huawei HoringerInner Mongolia, ChinaOperating351 MWIT power
    Huawei WuhuAnhui, ChinaOperating453 MWIT power
    Humain AI Data CentersRiyadh Province, Saudi ArabiaUnder construction200 MWbasis not stated
    Meta AikenSouth Carolina, United StatesOperating129 MWIT power
    Meta Bowling GreenOhio, United StatesUnder construction422 MWIT power
    Meta CheyenneWyoming, United StatesOperating207 MWIT power
    Meta Eagle MountainUtah, United StatesOperating133 MWIT power
    Meta El PasoTexas, United StatesUnder construction1 GWbasis not stated
    Meta GallatinTennessee, United StatesOperating87 MWIT power
    Meta HuntsvilleAlabama, United StatesOperating146 MWIT power
    Meta HyperionLouisiana, United StatesUnder construction5 GWbasis not stated
    Meta JeffersonvilleIndiana, United StatesOperating178 MWIT power
    Meta KunaIdaho, United StatesOperating152 MWIT power
    Meta LebanonIndiana, United StatesUnder construction1 GWbasis not stated
    Meta Los LunasNew Mexico, United StatesOperating218 MWIT power
    Meta MontgomeryAlabama, United StatesOperating358 MWIT power
    Meta PrometheusOhio, United StatesUnder construction1 GWbasis not stated
    Meta RosemountMinnesota, United StatesOperating178 MWIT power
    Meta SarpyNebraska, United StatesOperating80 MWIT power
    Meta TempleTexas, United StatesOperating178 MWIT power
    Meta-QTS Hillsboro 2Oregon, United StatesOperating180 MWIT power
    Microsoft Fairwater AtlantaGeorgia, United StatesOperatingnot stated
    Microsoft Fairwater WisconsinWisconsin, United StatesOperating2 GWbasis not stated
    Microsoft GoodyearArizona, United StatesOperating202 MWIT power
    Microsoft India South Central regionTelangana, IndiaOperating600 MWbasis not stated
    Microsoft Project OsmiumIowa, United StatesOperating190 MWIT power
    Microsoft SAT14Texas, United StatesOperating47 MWIT power
    Microsoft SAT40Texas, United StatesOperating75 MWIT power
    Microsoft-Nebius New JerseyNew Jersey, United StatesOperating50 MWIT power
    Narvik AI gigafactory (ex-Stargate Norway)Nordland, NorwayUnder construction230 MWbasis not stated
    Nebius MantsalaUusimaa, FinlandOperating145 MWIT power
    Nscale KeflavikSouthern Peninsula, IcelandOperating10 MWIT power
    Nscale Loughton AI CampusEngland, United KingdomPlanned90 MWbasis not stated
    Nxera DC TuasSingaporeOperating58 MWbasis not stated
    Oracle BatamRiau Islands, IndonesiaOperating72 MWIT power
    Project JadeWyoming, United StatesStalled or cut back1.8 GWbasis not stated
    Project MatadorTexas, United StatesUnder constructionnot stated
    Pure DC AMS01North Holland, NetherlandsUnder construction78 MWbasis not stated
    QTS Cedar RapidsIowa, United StatesUnder construction1.1 GWIT power
    QTS Eagle MountainUtah, United StatesUnder construction304 MWIT power
    QTS Richmond 1Virginia, United StatesOperating238 MWIT power
    QTS Richmond 2Virginia, United StatesOperating180 MWIT power
    QTS Richmond 3Virginia, United StatesOperating240 MWIT power
    Reliance–Meta JamnagarGujarat, IndiaPlanned168 MWbasis not stated
    SK-AWS Ulsan AI data centerUlsan, South KoreaUnder construction100 MWbasis not stated
    SoftBank Tomakomai AI data centerHokkaido, JapanUnder construction300 MWbasis not stated
    Southgate MelbourneVictoria, AustraliaOperating41 MWIT power
    STACK Infrastructure NVA02Virginia, United StatesOperating348 MWIT power
    Stargate AbileneTexas, United StatesOperating1.2 GWfacility power
    Stargate Doña Ana (Project Jupiter)New Mexico, United StatesUnder construction2.2 GWfacility power
    Stargate LordstownOhio, United StatesUnder constructionnot stated
    Stargate Milam CountyTexas, United StatesUnder construction1.2 GWfacility power
    Stargate Port Washington (Lighthouse)Wisconsin, United StatesUnder construction1.3 GWfacility power
    Stargate Saline Township (The Barn)Michigan, United StatesUnder construction1.4 GWfacility power
    Stargate Shackelford CountyTexas, United StatesUnder construction2 GWfacility power
    Stargate UAE (UAE–US AI Campus)Abu Dhabi, United Arab EmiratesUnder construction5 GWbasis not stated
    Start Campus Sines Data CampusSetúbal, PortugalOperating233 MWIT power
    Stream PhoenixArizona, United StatesOperating220 MWIT power
    Vantage Québec expansionQuebec, CanadaOperating178 MWbasis not stated
    Vantage TX1Texas, United StatesOperating128 MWIT power
    VNET Bayin UlanqabInner Mongolia, ChinaOperating700 MWIT power
    xAI Colossus 2Tennessee, United StatesOperating2 GWIT power
    xAI QTS AtlantaGeorgia, United StatesOperating17 MWIT power
    YTL JohorJohor, MalaysiaOperating284 MWIT power