Thursday, November 26, 2026IF YOU DON'T KNOW, KOKO KNOWS.
Tracked AI Data Center Campuses
Every tracked AI campus, with its sources and what changed.
Every tracked AI campus has a page of its own with its reported figures, its sources and what changed. Megawatts keep the basis each source used and are never added across bases.
Recent changes to tracked campuses
- Recorded : Digital Realty UK AI mega-campus. Removed from the register.
- Recorded : Microsoft India South Central region. Status changed from under construction to operating. A source added to the record the same day (it may support a different field): DCD — Microsoft launches India South Central cloud region in Hyderabad, dated .
- Recorded : Stargate Abilene. Operating capacity basis changed from facility power to basis not stated. A source added to the record the same day (it may support a different field): Epoch AI — OpenAI Stargate Abilene (site timeline, latest entry 2026-11-01), dated .
- Recorded : Stargate Abilene. Operating capacity changed from 300 MW (facility power) to 618 MW (basis not stated). A source added to the record the same day (it may support a different field): Epoch AI — OpenAI Stargate Abilene (site timeline, latest entry 2026-11-01), dated .
- Recorded : Stargate Lordstown. Status changed from announced to under construction. A source added to the record the same day (it may support a different field): Epoch AI — OpenAI Stargate Lordstown (site timeline, latest entry 2026-07-30), dated .
- Recorded : Stargate Lordstown. Full-build capacity changed from 300 MW (facility power) to not reported. Latest source on the record at the time (it may not be the source of this change): Epoch AI — OpenAI Stargate: where the US sites stand, dated .Editor's note: The source gives an upper bound of less than 300 MW, not an exact figure. The exact value is withheld and the bound is kept in the record's notes: a bound is not converted to a measurement.
Changes to a campus already in the register, newest first, since October 16, 2026. "Recorded" is the day a change was entered here, not the day it happened. Newly added campuses and recordkeeping changes are listed on each campus's own page.
All tracked campuses (120)
| Campus | Place | Status | Full build |
|---|---|---|---|
| AirTrunk TOK1 | Chiba, Japan | Operating | 300 MWbasis not stated |
| Alibaba Zhangbei | Hebei, China | Operating | 169 MWIT power |
| Amazon Madison Mega Site | Mississippi, United States | Operating | 683 MWIT power |
| Amazon Project Rainier | Indiana, United States | Operating | 2.2 GWbasis not stated |
| Amazon Ridgeland | Mississippi, United States | Operating | 840 MWIT power |
| Anthropic Barber Lake | Texas, United States | Under construction | 207 MWIT power |
| Anthropic Lake Mariner | New York, United States | Operating | 378 MWIT power |
| AWS Berwick | Pennsylvania, United States | Operating | 169 MWIT power |
| AWS New Albany | Ohio, United States | Operating | 338 MWIT power |
| AWS Peru region | Lima, Peru | Announced | 40 MWbasis not stated |
| Bridge Data Centres MY06 | Johor, Malaysia | Operating | 243 MWIT power |
| Campus AI (MGX · Mistral) Île-de-France | Île-de-France, France | Planned | 1.4 GWbasis not stated |
| CDC Marsden Park | New South Wales, Australia | Under construction | 504 MWIT power |
| Colossus 1 | Tennessee, United States | Operating | 340 MWIT power |
| Core42 Lake Mariner | New York, United States | Operating | 58 MWIT power |
| CoreWeave Chester VA | Virginia, United States | Operating | 113 MWIT power |
| CoreWeave Dalton 1 & 2 | Georgia, United States | Operating | 28 MWIT power |
| CoreWeave Denton TX | Texas, United States | Operating | 282 MWIT power |
| CoreWeave Ellendale ND | North Dakota, United States | Operating | 400 MWIT power |
| Coreweave Helios | Texas, United States | Operating | 528 MWIT power |
| CoreWeave Lancaster Greenfield site | Pennsylvania, United States | Under construction | 92 MWIT power |
| CoreWeave Marble NC | North Carolina, United States | Operating | 65 MWIT power |
| CoreWeave Muskogee OK | Oklahoma, United States | Under construction | 153 MWIT power |
| CoreWeave Norway | Agder, Norway | Operating | 42 MWIT power |
| Crusoe Abilene Expansion | Texas, United States | Under construction | 672 MWIT power |
| CyrusOne FRA7 | Hesse, Germany | Under construction | 81 MWIT power |
| Data Center Valley, Ekibastuz | Pavlodar Region, Kazakhstan | Under construction | 1 GWbasis not stated |
| DayOne Kempas | Johor, Malaysia | Operating | 422 MWIT power |
| DayOne Nusajaya | Johor, Malaysia | Operating | 473 MWIT power |
| Echelon DUB10 | County Dublin, Ireland | Under construction | 90 MWIT power |
| EcoDataCenter 2 | Dalarna, Sweden | Under construction | 48 MWIT power |
| Envision Galaxy Ulanqab | Inner Mongolia, China | Operating | 470 MWIT power |
| Equinix SP7 São Paulo | São Paulo, Brazil | Planned | 14 MWbasis not stated |
| Goodnight | Texas, United States | Under construction | 1.0 GWIT power |
| Google AI Hub Visakhapatnam | Andhra Pradesh, India | Under construction | 1 GWbasis not stated |
| Google Arcola | Virginia, United States | Operating | 77 MWIT power |
| Google Bristow | Virginia, United States | Operating | 238 MWIT power |
| Google Cedar Rapids | Iowa, United States | Under construction | 261 MWIT power |
| Google Columbus | Ohio, United States | Operating | 386 MWIT power |
| Google Council Bluffs (East) | Iowa, United States | Operating | 237 MWIT power |
| Google Fort Wayne | Indiana, United States | Under construction | 863 MWIT power |
| Google Kansas City East | Missouri, United States | Operating | 105 MWIT power |
| Google Lancaster | Ohio, United States | Operating | 137 MWIT power |
| Google Lincoln | Nebraska, United States | Operating | 283 MWIT power |
| Google Mesa | Arizona, United States | Operating | 183 MWIT power |
| Google Midlothian | Texas, United States | Operating | 103 MWIT power |
| Google New Albany | Ohio, United States | Operating | 333 MWIT power |
| Google Omaha | Nebraska, United States | Operating | 395 MWIT power |
| Google Papillion | Nebraska, United States | Operating | 237 MWIT power |
| Google Pryor (North) | Oklahoma, United States | Operating | 368 MWIT power |
| Google Red Oak | Texas, United States | Operating | 154 MWIT power |
| Google Storey County | Nevada, United States | Operating | 300 MWIT power |
| Google The Dalles | Oregon, United States | Operating | 154 MWIT power |
| Google Waltham Cross | England, United Kingdom | Operating | 88 MWIT power |
| Google Wilbarger County | Texas, United States | Under construction | not stated |
| Homer City Energy Campus | Pennsylvania, United States | Under construction | 4.5 GWbasis not stated |
| Huawei Horinger | Inner Mongolia, China | Operating | 351 MWIT power |
| Huawei Wuhu | Anhui, China | Operating | 453 MWIT power |
| Humain AI Data Centers | Riyadh Province, Saudi Arabia | Under construction | 200 MWbasis not stated |
| Meta Aiken | South Carolina, United States | Operating | 129 MWIT power |
| Meta Bowling Green | Ohio, United States | Under construction | 422 MWIT power |
| Meta Cheyenne | Wyoming, United States | Operating | 207 MWIT power |
| Meta Eagle Mountain | Utah, United States | Operating | 133 MWIT power |
| Meta El Paso | Texas, United States | Under construction | 1 GWbasis not stated |
| Meta Gallatin | Tennessee, United States | Operating | 87 MWIT power |
| Meta Huntsville | Alabama, United States | Operating | 146 MWIT power |
| Meta Hyperion | Louisiana, United States | Under construction | 5 GWbasis not stated |
| Meta Jeffersonville | Indiana, United States | Operating | 178 MWIT power |
| Meta Kuna | Idaho, United States | Operating | 152 MWIT power |
| Meta Lebanon | Indiana, United States | Under construction | 1 GWbasis not stated |
| Meta Los Lunas | New Mexico, United States | Operating | 218 MWIT power |
| Meta Montgomery | Alabama, United States | Operating | 358 MWIT power |
| Meta Prometheus | Ohio, United States | Under construction | 1 GWbasis not stated |
| Meta Rosemount | Minnesota, United States | Operating | 178 MWIT power |
| Meta Sarpy | Nebraska, United States | Operating | 80 MWIT power |
| Meta Temple | Texas, United States | Operating | 178 MWIT power |
| Meta-QTS Hillsboro 2 | Oregon, United States | Operating | 180 MWIT power |
| Microsoft Fairwater Atlanta | Georgia, United States | Operating | not stated |
| Microsoft Fairwater Wisconsin | Wisconsin, United States | Operating | 2 GWbasis not stated |
| Microsoft Goodyear | Arizona, United States | Operating | 202 MWIT power |
| Microsoft India South Central region | Telangana, India | Operating | 600 MWbasis not stated |
| Microsoft Project Osmium | Iowa, United States | Operating | 190 MWIT power |
| Microsoft SAT14 | Texas, United States | Operating | 47 MWIT power |
| Microsoft SAT40 | Texas, United States | Operating | 75 MWIT power |
| Microsoft-Nebius New Jersey | New Jersey, United States | Operating | 50 MWIT power |
| Narvik AI gigafactory (ex-Stargate Norway) | Nordland, Norway | Under construction | 230 MWbasis not stated |
| Nebius Mantsala | Uusimaa, Finland | Operating | 145 MWIT power |
| Nscale Keflavik | Southern Peninsula, Iceland | Operating | 10 MWIT power |
| Nscale Loughton AI Campus | England, United Kingdom | Planned | 90 MWbasis not stated |
| Nxera DC Tuas | Singapore | Operating | 58 MWbasis not stated |
| Oracle Batam | Riau Islands, Indonesia | Operating | 72 MWIT power |
| Project Jade | Wyoming, United States | Stalled or cut back | 1.8 GWbasis not stated |
| Project Matador | Texas, United States | Under construction | not stated |
| Pure DC AMS01 | North Holland, Netherlands | Under construction | 78 MWbasis not stated |
| QTS Cedar Rapids | Iowa, United States | Under construction | 1.1 GWIT power |
| QTS Eagle Mountain | Utah, United States | Under construction | 304 MWIT power |
| QTS Richmond 1 | Virginia, United States | Operating | 238 MWIT power |
| QTS Richmond 2 | Virginia, United States | Operating | 180 MWIT power |
| QTS Richmond 3 | Virginia, United States | Operating | 240 MWIT power |
| Reliance–Meta Jamnagar | Gujarat, India | Planned | 168 MWbasis not stated |
| SK-AWS Ulsan AI data center | Ulsan, South Korea | Under construction | 100 MWbasis not stated |
| SoftBank Tomakomai AI data center | Hokkaido, Japan | Under construction | 300 MWbasis not stated |
| Southgate Melbourne | Victoria, Australia | Operating | 41 MWIT power |
| STACK Infrastructure NVA02 | Virginia, United States | Operating | 348 MWIT power |
| Stargate Abilene | Texas, United States | Operating | 1.2 GWfacility power |
| Stargate Doña Ana (Project Jupiter) | New Mexico, United States | Under construction | 2.2 GWfacility power |
| Stargate Lordstown | Ohio, United States | Under construction | not stated |
| Stargate Milam County | Texas, United States | Under construction | 1.2 GWfacility power |
| Stargate Port Washington (Lighthouse) | Wisconsin, United States | Under construction | 1.3 GWfacility power |
| Stargate Saline Township (The Barn) | Michigan, United States | Under construction | 1.4 GWfacility power |
| Stargate Shackelford County | Texas, United States | Under construction | 2 GWfacility power |
| Stargate UAE (UAE–US AI Campus) | Abu Dhabi, United Arab Emirates | Under construction | 5 GWbasis not stated |
| Start Campus Sines Data Campus | Setúbal, Portugal | Operating | 233 MWIT power |
| Stream Phoenix | Arizona, United States | Operating | 220 MWIT power |
| Vantage Québec expansion | Quebec, Canada | Operating | 178 MWbasis not stated |
| Vantage TX1 | Texas, United States | Operating | 128 MWIT power |
| VNET Bayin Ulanqab | Inner Mongolia, China | Operating | 700 MWIT power |
| xAI Colossus 2 | Tennessee, United States | Operating | 2 GWIT power |
| xAI QTS Atlanta | Georgia, United States | Operating | 17 MWIT power |
| YTL Johor | Johor, Malaysia | Operating | 284 MWIT power |
Powered by KokoAI