Under construction · North America
Stargate Lordstown
Lordstown, Ohio, United States
- Full build
- not stated (facility power)
- Reported operating
- 0 MW (facility power)
- For
- OpenAI (SoftBank-owned hardware)
- Built by
- SoftBank · Foxconn
- Investment
- not stated
- Investors
- SoftBank Group · Foxconn
- Power
- The former GM plant already has a substation connected.
- Timing
- Active construction with the roof mostly on by July 30, 2026, though no building was running. Epoch AI projects operation from March 2027.
- Jobs
- not stated
- Community
- not stated
- Contested
- not recorded in this snapshot; absence is not evidence of no dispute
- AI tie
- A SoftBank–Foxconn joint venture on the former GM Lordstown site; the smallest Stargate site at under 0.3 GW.
- Note
- Epoch AI's site page projects 214 MW of IT power; OpenAI's own statements imply about 300 MW. Neither is a company figure for this site, so the capacity is withheld from totals.
Evidence and delivery dependencies
Metrics: capacityMw, operatingMw, timing, power, status. Historical April snapshot. Epoch estimates total facility power, including conversions from IT power; projected completion is not a commissioning guarantee. Other record fields retain their original sources.
Elliot Stewart and Ben Cottier / Epoch AI — Stargate (CC BY) · Third-party estimatePublished: 2026-04-17 · Effective: 2026-04-23 · Source checked: 2026-10-18 · Next review: 2026-11-18- Source review overdue
- Historical evidence requires current status check
- Epoch reports less than 300 MW, not an exact 300 MW. The exact capacity is withheld pending clarification; the source describes manufacturing activity and limited campus construction.
Diligence sequence: power agreement → load connection → permits → equipment → building → fit-out → commissioning. Completion of each dependency is unverified unless the linked evidence explicitly establishes it.
Sources
- Epoch AI — OpenAI Stargate: where the US sites stand · Third-party estimatePublished: 2026-04-17 · Effective: 2026-04-23 · Source checked: 2026-10-18 · Next review: 2026-11-18
- Epoch AI — OpenAI Stargate Lordstown (site timeline, latest entry 2026-07-30) · Third-party estimatePublished: not distinguished · Effective: not specified · Source checked: 2026-11-12 · Next review: 2026-12-12 · Legacy source/access date: 2026-07-30
What changed
- Recorded : Status changed from announced to under construction. A source added to the record the same day (it may support a different field): Epoch AI — OpenAI Stargate Lordstown (site timeline, latest entry 2026-07-30), dated .
- Recorded : Full-build capacity changed from 300 MW (facility power) to not reported. Latest source on the record at the time (it may not be the source of this change): Epoch AI — OpenAI Stargate: where the US sites stand, dated .Editor's note: The source gives an upper bound of less than 300 MW, not an exact figure. The exact value is withheld and the bound is kept in the record's notes: a bound is not converted to a measurement.
- Recorded : Recordkeeping: the register began recording what an operating figure counts (facility power). No reported figure changed.
This history begins on October 16, 2026. "Recorded" is the day a change was entered here, not the day it happened. Tracked: name, tenant, status, capacity and what it counts, and stated investment. Changes to other fields, such as sources, timing and power, are not listed.