Under construction · Europe
Echelon DUB10
Clondalkin, County Dublin, Ireland
- Full build
- 90 MW (IT power)
- Reported operating
- not stated (basis not stated)
- For
- Not named
- Built by
- Echelon Data Centres
- Investment
- not stated
- Investors
- Power
- Not stated in the report read. New Dublin connections fall under the regulator's large energy user policy (see the Dublin connection policy record).
- Timing
- Not stated in the report read.
- Jobs
- not stated
- Community
- not stated
- Contested
- not recorded in this snapshot; absence is not evidence of no dispute
- AI tie
- A wholesale campus in the Dublin market; recorded for market coverage, not as an AI training site.
- Note
- The Irish Examiner describes the campus as designed to provide over 90 megawatts of IT load. It does not state how much is built or running. Echelon's own update is titled 'DUB10 substation construction well underway in Clondalkin'; that page could not be opened to date it, so the stage rests on its title and should be confirmed. The pin marks Clondalkin, not the surveyed site.
Evidence and delivery dependencies
- Metric-level verification not recorded
Diligence sequence: power agreement → load connection → permits → equipment → building → fit-out → commissioning. Completion of each dependency is unverified unless the linked evidence explicitly establishes it.
Sources
- Irish Examiner — Renewable Island: Energy infrastructure at core of Echelon's plans · reportingPublished: 2026-11-12 · Effective: not specified · Source checked: 2026-11-24 · Next review: 2026-12-24
What changed
No changes recorded since November 24, 2026.
First recorded on November 24, 2026. "Recorded" is the day a change was entered here, not the day it happened. Tracked: name, tenant, status, capacity and what it counts, and stated investment. Changes to other fields, such as sources, timing and power, are not listed.