    Echelon DUB10

    Reported figures, sources and what changed.

    Under construction · Europe

    Echelon DUB10

    Clondalkin, County Dublin, Ireland

    Full build
    90 MW (IT power)
    Reported operating
    not stated (basis not stated)
    For
    Not named
    Built by
    Echelon Data Centres
    Investment
    not stated
    Investors
    Power
    Not stated in the report read. New Dublin connections fall under the regulator's large energy user policy (see the Dublin connection policy record).
    Timing
    Not stated in the report read.
    Jobs
    not stated
    Community
    not stated
    Contested
    not recorded in this snapshot; absence is not evidence of no dispute
    AI tie
    A wholesale campus in the Dublin market; recorded for market coverage, not as an AI training site.
    Note
    The Irish Examiner describes the campus as designed to provide over 90 megawatts of IT load. It does not state how much is built or running. Echelon's own update is titled 'DUB10 substation construction well underway in Clondalkin'; that page could not be opened to date it, so the stage rests on its title and should be confirmed. The pin marks Clondalkin, not the surveyed site.

    Evidence and delivery dependencies

    • Metric-level verification not recorded

    Diligence sequence: power agreement → load connection → permits → equipment → building → fit-out → commissioning. Completion of each dependency is unverified unless the linked evidence explicitly establishes it.

    Sources

    What changed

    No changes recorded since November 24, 2026.

    First recorded on November 24, 2026. "Recorded" is the day a change was entered here, not the day it happened. Tracked: name, tenant, status, capacity and what it counts, and stated investment. Changes to other fields, such as sources, timing and power, are not listed.