    2.2 GW (facility power)
    Reported operating
    0 MW (facility power)
    For
    OpenAI (Oracle-operated)
    Built by
    STACK Infrastructure
    Investment
    not stated
    Investors
    STACK Infrastructure · Oracle (hardware)
    Power
    Grid; facility-power figure.
    Timing
    Construction had advanced well past foundations by June 22, 2026, with no building yet running. Epoch AI projects completion by the end of 2028.
    Jobs
    not stated
    Community
    not stated
    Contested
    • The air permit for the on-site microgrid is still pending. On November 6, 2026 the hearing officer vacated the December 7 hearing and set no new date; the state and the developer had already waived the November 23 decision deadline. A status conference is set for November 19, and a new hearing waits on the state's revised recommendation.
    AI tie
    Stargate's largest projected single site.
    Note
    Epoch AI's site page projects 1,750 MW of IT power; the 2,200 MW figure here is facility power from its overview, a different basis. The developer's latest permit filing replaces gas turbines with fuel cells.

    Evidence and delivery dependencies

    Metrics: capacityMw, operatingMw, timing, power, status. Historical April snapshot. Epoch estimates total facility power, including conversions from IT power; projected completion is not a commissioning guarantee. Other record fields retain their original sources.

    Elliot Stewart and Ben Cottier / Epoch AI — Stargate (CC BY) · Third-party estimatePublished: 2026-04-17 · Effective: 2026-04-23 · Source checked: 2026-10-18 · Next review: 2026-11-18
    • Source review overdue
    • Historical evidence requires current status check

    Diligence sequence: power agreement → load connection → permits → equipment → building → fit-out → commissioning. Completion of each dependency is unverified unless the linked evidence explicitly establishes it.

    Sources

    What changed

    1. Recorded : Recordkeeping: the register began recording what an operating figure counts (facility power). No reported figure changed.

    This history begins on October 16, 2026. "Recorded" is the day a change was entered here, not the day it happened. Tracked: name, tenant, status, capacity and what it counts, and stated investment. Changes to other fields, such as sources, timing and power, are not listed.

    Open Stargate Doña Ana (Project Jupiter) on the map →
    Powered by KokoAI