Skip to main content
    Thursday, November 26, 2026

    Stargate Abilene

    Reported figures, sources and what changed.

    Operating · North America

    Stargate Abilene

    Abilene, Texas, United States

    Full build
    1.2 GW (facility power)
    Reported operating
    618 MW (basis not stated)
    For
    OpenAI (Oracle-operated)
    Built by
    Crusoe · Oracle
    Investment
    not stated
    Investors
    Crusoe · Blue Owl Capital · Primary Digital Infrastructure · Oracle (hardware)
    Power
    Grid plus on-site gas turbines; the campus sits beside a wind farm. Figures are total facility power.
    Timing
    First phase live September 2025. Oracle said on September 10, 2026 that six of eight buildings, 618 MW, had been delivered to the customer. It gave no date for the last two; the campus was first due complete by mid-2026. Epoch AI's satellite review estimates that buildings 7 and 8 were running by November 1, 2026; no company has confirmed it.
    Jobs
    Construction: ~9,000 on site (reported), up from 6,000+ in September 2025. Permanent: 57 contractual minimum (Bloomberg) · 357 full-time commitment (Crusoe).
    Community
    Local tax abatement in exchange for the job commitments; the largest construction workforce in the city's history.
    Contested
    • Oracle and OpenAI dropped a 600 MW expansion in March 2026 after financing talks failed. Crusoe is building a separate 900 MW campus next door for Microsoft instead.
    • The last two buildings are behind the original mid-2026 schedule.
    AI tie
    The first Stargate campus; Oracle says it will house more than 450,000 NVIDIA GB200 GPUs at full build.
    Note
    Oracle called the 618 MW 75% of total capacity, so it is not the same measure as the 1.2 GW facility figure; its basis is recorded as not stated. The figure comes from earnings-call transcripts, not an Oracle filing. Epoch AI estimates 824 MW of IT power with all eight buildings running; the register keeps Oracle's 618 MW because Epoch's figure is an estimate. The two permanent-jobs figures describe different commitments, not a disagreement about one.

    Evidence and delivery dependencies

    Metrics: capacityMw, operatingMw, timing, power, status. Historical April snapshot. Epoch estimates total facility power, including conversions from IT power; projected completion is not a commissioning guarantee. Other record fields retain their original sources.

    Elliot Stewart and Ben Cottier / Epoch AI — Stargate (CC BY) · Third-party estimatePublished: 2026-04-17 · Effective: 2026-04-23 · Source checked: 2026-10-18 · Next review: 2026-11-18
    • Source review overdue
    • Historical evidence requires current status check

    Diligence sequence: power agreement → load connection → permits → equipment → building → fit-out → commissioning. Completion of each dependency is unverified unless the linked evidence explicitly establishes it.

    physical supply · reported operating: Epoch's April snapshot describes on-site gas plus grid supply. No current metered contribution is established.

    Elliot Stewart and Ben Cottier / Epoch AI — Stargate (CC BY) · Third-party estimatePublished: 2026-04-17 · Effective: 2026-04-23 · Source checked: 2026-10-18 · Next review: 2026-11-18

    Sources

    What changed

    1. Recorded : Operating capacity basis changed from facility power to basis not stated. A source added to the record the same day (it may support a different field): Epoch AI — OpenAI Stargate Abilene (site timeline, latest entry 2026-11-01), dated .
    2. Recorded : Operating capacity changed from 300 MW (facility power) to 618 MW (basis not stated). A source added to the record the same day (it may support a different field): Epoch AI — OpenAI Stargate Abilene (site timeline, latest entry 2026-11-01), dated .
    3. Recorded : Recordkeeping: the register began recording what an operating figure counts (facility power). No reported figure changed.

    This history begins on October 16, 2026. "Recorded" is the day a change was entered here, not the day it happened. Tracked: name, tenant, status, capacity and what it counts, and stated investment. Changes to other fields, such as sources, timing and power, are not listed.

    Open Stargate Abilene on the map →
    Powered by KokoAI