Skip to main content
    Thursday, November 26, 2026

    Meta Cheyenne

    Reported figures, sources and what changed.

    Operating · North America

    Meta Cheyenne

    Cheyenne, Wyoming, United States

    Full build
    207 MW (IT power)
    Reported operating
    152 MW (IT power)
    For
    Meta
    Built by
    Meta
    Investment
    not stated
    Investors
    Power
    Not reported.
    Timing
    Epoch AI dates the first capacity to July 2026. Epoch AI's latest entry, July 25, 2026: "Both buildings estimated to be operational." Epoch AI projects 207 MW of IT power by February 2027.
    Jobs
    not stated
    Community
    not stated
    Contested
    not recorded in this snapshot; absence is not evidence of no dispute
    AI tie
    Chip types Epoch AI lists: B300.
    Record type
    Third-party estimate from Epoch AI (CC BY). Not read from an operator's own statement.
    Note
    Third-party estimate. Epoch AI reads IT power from satellite imagery, permits and public documents; the operator has not confirmed these figures. Epoch AI estimates 182 MW of total facility power for the same date; the register keeps the IT power figure. Epoch AI models the capital cost to date at about $5.8 billion in 2025 dollars, calculated from IT power; it is not a stated investment.

    Evidence and delivery dependencies

    • Metric-level verification not recorded

    Diligence sequence: power agreement → load connection → permits → equipment → building → fit-out → commissioning. Completion of each dependency is unverified unless the linked evidence explicitly establishes it.

    Sources

    What changed

    No changes recorded since November 20, 2026.

    First recorded on November 20, 2026. "Recorded" is the day a change was entered here, not the day it happened. Tracked: name, tenant, status, capacity and what it counts, and stated investment. Changes to other fields, such as sources, timing and power, are not listed.

    Open Meta Cheyenne on the map →
    Powered by KokoAI