Skip to main content
    Thursday, November 26, 2026

    Narvik AI gigafactory (ex-Stargate Norway)

    Reported figures, sources and what changed.

    Under construction · Europe

    Narvik AI gigafactory (ex-Stargate Norway)

    Kvandal, Narvik, Norway

    Full build
    230 MW (basis not stated)
    Reported operating
    not stated (basis not stated)
    For
    Microsoft (replacing OpenAI)
    Built by
    Nscale · Aker ASA
    Investment
    $1 billion (as reported)
    Investors
    Aker ASA · Nscale
    Power
    100% renewable (hydro) above the Arctic Circle.
    Timing
    First 230 MW phase targeted for H2 2026 (aggregator figure); Microsoft's 30,000 NVIDIA Rubin GPUs delivered in 2027; a 520 MW longer-term plan.
    Jobs
    not stated
    Community
    Cheap hydro and cold air; a sovereign-compute pitch for Europe.
    Contested
    • OpenAI dropped its lease in April 2026 without a final contract; Microsoft took the capacity.
    AI tie
    Launched as Stargate Norway in 2025 with a 100,000-GPU ambition; now a Microsoft capacity contract.
    Note
    The $1 billion figure is the reported first-phase investment.

    Evidence and delivery dependencies

    • Metric-level verification not recorded
    • Full-build power basis not stated

    Diligence sequence: power agreement → load connection → permits → equipment → building → fit-out → commissioning. Completion of each dependency is unverified unless the linked evidence explicitly establishes it.

    Sources

    What changed

    1. Recorded : Recordkeeping: an unstated operating figure that was stored as 0 now reads not reported. No reported figure changed.

    This history begins on October 16, 2026. "Recorded" is the day a change was entered here, not the day it happened. Tracked: name, tenant, status, capacity and what it counts, and stated investment. Changes to other fields, such as sources, timing and power, are not listed.

    Open Narvik AI gigafactory (ex-Stargate Norway) on the map →