Under construction · Europe
Pure DC AMS01
Amsterdam, North Holland, Netherlands
- Full build
- 78 MW (basis not stated)
- Reported operating
- 0 MW (basis not stated)
- For
- Not named
- Built by
- Pure DC
- Investment
- not stated
- Investors
- Power
- A private substation with a firm connection to the 50 kV grid; Pure DC says it is built and live.
- Timing
- Data hall development began in January 2026, per Pure DC. The page gives no completion date.
- Jobs
- Construction: more than 1,000 jobs provided directly by the development (Pure DC).
- Community
- not stated
- Contested
- not recorded in this snapshot; absence is not evidence of no dispute
- AI tie
- Three towers of 26 MW each, designed for high-density computing; the whole campus is leased, to a tenant Pure DC does not name.
- Note
- Pure DC says it is investing more than EUR 1 billion; no US dollar figure is recorded. It does not state what the 78 MW counts. The target PUE is 1.2. The pin marks Westpoort, not the surveyed site.
Evidence and delivery dependencies
- Metric-level verification not recorded
- Full-build power basis not stated
Diligence sequence: power agreement → load connection → permits → equipment → building → fit-out → commissioning. Completion of each dependency is unverified unless the linked evidence explicitly establishes it.
Sources
- Pure DC — Amsterdam Westpoort (AMS01) · companyPublished: not distinguished · Effective: not specified · Source checked: 2026-11-24 · Next review: 2026-12-24 · Legacy source/access date: 2026-11-24
What changed
No changes recorded since November 24, 2026.
First recorded on November 24, 2026. "Recorded" is the day a change was entered here, not the day it happened. Tracked: name, tenant, status, capacity and what it counts, and stated investment. Changes to other fields, such as sources, timing and power, are not listed.