Skip to main content
    Thursday, November 26, 2026

    Meta Eagle Mountain

    Reported figures, sources and what changed.

    Operating · North America

    Meta Eagle Mountain

    Eagle Mountain, Utah, United States

    Full build
    133 MW (IT power)
    Reported operating
    133 MW (IT power)
    For
    Meta
    Built by
    Meta
    Investment
    not stated
    Investors
    Power
    Energy companies Epoch AI names: Williams. Fuel and contract terms are not reported there.
    Timing
    Epoch AI dates the first capacity to December 2025. Epoch AI's latest entry, May 2, 2026: "Satellite image shows strong evidence that Buildings 1 and 2 are operational: colored motion artifacts on many cooling fans, plus cars parked at the building entrances."
    Jobs
    not stated
    Community
    not stated
    Contested
    not recorded in this snapshot; absence is not evidence of no dispute
    AI tie
    Chip types Epoch AI lists: B300.
    Record type
    Third-party estimate from Epoch AI (CC BY). Not read from an operator's own statement.
    Note
    Third-party estimate. Epoch AI reads IT power from satellite imagery, permits and public documents; the operator has not confirmed these figures. Epoch AI estimates 179 MW of total facility power for the same date; the register keeps the IT power figure. Epoch AI models the capital cost to date at about $5.0 billion in 2025 dollars, calculated from IT power; it is not a stated investment. Construction companies Epoch AI names: Mortenson.

    Evidence and delivery dependencies

    • Metric-level verification not recorded

    Diligence sequence: power agreement → load connection → permits → equipment → building → fit-out → commissioning. Completion of each dependency is unverified unless the linked evidence explicitly establishes it.

    Sources

    What changed

    No changes recorded since November 20, 2026.

    First recorded on November 20, 2026. "Recorded" is the day a change was entered here, not the day it happened. Tracked: name, tenant, status, capacity and what it counts, and stated investment. Changes to other fields, such as sources, timing and power, are not listed.

    Open Meta Eagle Mountain on the map →
    Powered by KokoAI