Operating · North America
Google The Dalles
The Dalles, Oregon, United States
- Full build
- 154 MW (IT power)
- Reported operating
- 154 MW (IT power)
- For
- Built by
- Investment
- not stated
- Investors
- Power
- Not reported.
- Timing
- Epoch AI dates the first capacity to March 2025. Epoch AI's latest entry, April 29, 2026: "Building 2 is estimated to be operational, based on all external equipment being installed, and ordinary cars parked by the building."
- Jobs
- not stated
- Community
- not stated
- Contested
- not recorded in this snapshot; absence is not evidence of no dispute
- AI tie
- Chip types Epoch AI lists: TPU v6e, TPU v5p, TPU v5e and TPU v7.
- Record type
- Third-party estimate from Epoch AI (CC BY). Not read from an operator's own statement.
- Note
- Third-party estimate. Epoch AI reads IT power from satellite imagery, permits and public documents; the operator has not confirmed these figures. Epoch AI estimates 185 MW of total facility power for the same date; the register keeps the IT power figure. Epoch AI models the capital cost to date at about $5.8 billion in 2025 dollars, calculated from IT power; it is not a stated investment.
Evidence and delivery dependencies
- Metric-level verification not recorded
Diligence sequence: power agreement → load connection → permits → equipment → building → fit-out → commissioning. Completion of each dependency is unverified unless the linked evidence explicitly establishes it.
Sources
- Epoch AI — Google The Dalles (site page, latest entry 2026-04-29) · Third-party estimatePublished: not distinguished · Effective: not specified · Source checked: 2026-11-20 · Next review: 2026-12-20 · Legacy source/access date: 2026-04-29
What changed
No changes recorded since November 20, 2026.
First recorded on November 20, 2026. "Recorded" is the day a change was entered here, not the day it happened. Tracked: name, tenant, status, capacity and what it counts, and stated investment. Changes to other fields, such as sources, timing and power, are not listed.