Under construction · Europe
CyrusOne FRA7
Frankfurt, Hesse, Germany
- Full build
- 81 MW (IT power)
- Reported operating
- not stated (basis not stated)
- For
- Multi-tenant
- Built by
- CyrusOne
- Investment
- not stated
- Investors
- Power
- CyrusOne says the campus runs on 100% renewable energy and can supply up to 40 MW of waste heat to the district's heating network.
- Timing
- Ground was broken in July 2024 and the structure was topped out in February 2026. The first phase, 9 MW of IT capacity, was due in 2026.
- Jobs
- not stated
- Community
- Heat reuse of up to 40 MW for campus heating, per CyrusOne.
- Contested
- not recorded in this snapshot; absence is not evidence of no dispute
- AI tie
- A colocation campus in Frankfurt's Griesheim district; recorded for market coverage, not as an AI training site.
- Note
- CyrusOne's page says the campus delivers 81 MW of IT capacity and does not state how much is running. Two three-story buildings with nine data halls are planned. The pin marks Griesheim, not the surveyed site.
Evidence and delivery dependencies
- Metric-level verification not recorded
Diligence sequence: power agreement → load connection → permits → equipment → building → fit-out → commissioning. Completion of each dependency is unverified unless the linked evidence explicitly establishes it.
Sources
- CyrusOne — Frankfurt, Germany: FRA7 · companyPublished: not distinguished · Effective: not specified · Source checked: 2026-11-24 · Next review: 2026-12-24 · Legacy source/access date: 2026-11-24
- Baxtel — CyrusOne completes structural build on its latest Frankfurt data center in Germany · reportingPublished: 2026-02-09 · Effective: not specified · Source checked: 2026-11-24 · Next review: 2026-12-24
- DataCentreNews UK — CyrusOne breaks ground on billion dollar data centre in Germany · reportingPublished: 2024-07-21 · Effective: not specified · Source checked: 2026-11-24 · Next review: 2026-12-24
What changed
No changes recorded since November 24, 2026.
First recorded on November 24, 2026. "Recorded" is the day a change was entered here, not the day it happened. Tracked: name, tenant, status, capacity and what it counts, and stated investment. Changes to other fields, such as sources, timing and power, are not listed.