Skip to main content
    Thursday, November 26, 2026

    Nscale Loughton AI Campus

    Reported figures, sources and what changed.

    Planned · Europe

    Nscale Loughton AI Campus

    Loughton, England, United Kingdom

    Full build
    90 MW (basis not stated)
    Reported operating
    not stated (basis not stated)
    For
    Microsoft
    Built by
    Nscale
    Investment
    not stated
    Investors
    Power
    Grid connection through UK Power Networks; its date is contested (see Contested).
    Timing
    Announced in September 2025 at 50 MW, scalable to 90 MW, with 23,040 NVIDIA GB300 GPUs due from the first quarter of 2027.
    Jobs
    not stated
    Community
    not stated
    Contested
    • The Guardian reported in September 2026 that grid power may not reach the site until the early to mid 2030s. The date is reported and unconfirmed.
    AI tie
    Planned as the United Kingdom's largest AI supercomputer, serving Microsoft Azure. Announced beside Stargate UK, under which OpenAI may take up to 8,000 GPUs across Nscale's UK sites.
    Note
    No source states what the megawatts count, and none read here confirms that construction has started, so the record is Planned. The pin marks Loughton, not the surveyed site.

    Evidence and delivery dependencies

    • Metric-level verification not recorded
    • Full-build power basis not stated

    Diligence sequence: power agreement → load connection → permits → equipment → building → fit-out → commissioning. Completion of each dependency is unverified unless the linked evidence explicitly establishes it.

    Sources

    What changed

    No changes recorded since November 24, 2026.

    First recorded on November 24, 2026. "Recorded" is the day a change was entered here, not the day it happened. Tracked: name, tenant, status, capacity and what it counts, and stated investment. Changes to other fields, such as sources, timing and power, are not listed.

    Open Nscale Loughton AI Campus on the map →
    Powered by KokoAI