Planned · Europe
Nscale Loughton AI Campus
Loughton, England, United Kingdom
- Full build
- 90 MW (basis not stated)
- Reported operating
- not stated (basis not stated)
- For
- Microsoft
- Built by
- Nscale
- Investment
- not stated
- Investors
- Power
- Grid connection through UK Power Networks; its date is contested (see Contested).
- Timing
- Announced in September 2025 at 50 MW, scalable to 90 MW, with 23,040 NVIDIA GB300 GPUs due from the first quarter of 2027.
- Jobs
- not stated
- Community
- not stated
- Contested
- The Guardian reported in September 2026 that grid power may not reach the site until the early to mid 2030s. The date is reported and unconfirmed.
- AI tie
- Planned as the United Kingdom's largest AI supercomputer, serving Microsoft Azure. Announced beside Stargate UK, under which OpenAI may take up to 8,000 GPUs across Nscale's UK sites.
- Note
- No source states what the megawatts count, and none read here confirms that construction has started, so the record is Planned. The pin marks Loughton, not the surveyed site.
Evidence and delivery dependencies
- Metric-level verification not recorded
- Full-build power basis not stated
Diligence sequence: power agreement → load connection → permits → equipment → building → fit-out → commissioning. Completion of each dependency is unverified unless the linked evidence explicitly establishes it.
Sources
- RCR Wireless News — Nscale outlines major UK AI infrastructure commitment with partners · reportingPublished: 2025-09-19 · Effective: not specified · Source checked: 2026-11-24 · Next review: 2026-12-24
- Supercomputing News — Nscale closes $2.36 billion; Loughton faces a reported grid wait · reportingPublished: 2026-09-27 · Effective: not specified · Source checked: 2026-11-24 · Next review: 2026-12-24
What changed
No changes recorded since November 24, 2026.
First recorded on November 24, 2026. "Recorded" is the day a change was entered here, not the day it happened. Tracked: name, tenant, status, capacity and what it counts, and stated investment. Changes to other fields, such as sources, timing and power, are not listed.