Skip to main content
    Thursday, November 26, 2026

    Equinix SP7 São Paulo

    Reported figures, sources and what changed.

    Planned · Latin America

    Equinix SP7 São Paulo

    São Paulo, Brazil

    Full build
    14 MW (basis not stated)
    Reported operating
    not stated (basis not stated)
    For
    Multi-tenant
    Built by
    Equinix
    Investment
    not stated
    Investors
    Equinix
    Power
    Grid (largely hydro).
    Timing
    Planned.
    Jobs
    not stated
    Community
    not stated
    Contested
    not recorded in this snapshot; absence is not evidence of no dispute
    AI tie
    Latin America's AI capacity is still measured in tens of megawatts; this is the register's smallest row, kept so the map does not read as if the region had nothing.

    Evidence and delivery dependencies

    • Metric-level verification not recorded
    • Full-build power basis not stated

    Diligence sequence: power agreement → load connection → permits → equipment → building → fit-out → commissioning. Completion of each dependency is unverified unless the linked evidence explicitly establishes it.

    Sources

    What changed

    1. Recorded : Recordkeeping: an unstated operating figure that was stored as 0 now reads not reported. No reported figure changed.

    This history begins on October 16, 2026. "Recorded" is the day a change was entered here, not the day it happened. Tracked: name, tenant, status, capacity and what it counts, and stated investment. Changes to other fields, such as sources, timing and power, are not listed.

    Open Equinix SP7 São Paulo on the map →