Operating · Asia-Pacific
Nxera DC Tuas
Tuas, Singapore, Singapore
- Full build
- 58 MW (basis not stated)
- Reported operating
- not stated (basis not stated)
- For
- Multi-tenant
- Built by
- Nxera (Singtel)
- Investment
- not stated
- Investors
- Power
- Not stated in the report read.
- Timing
- Opened in February 2026.
- Jobs
- not stated
- Community
- not stated
- Contested
- not recorded in this snapshot; absence is not evidence of no dispute
- AI tie
- Opened as an AI-ready facility with direct-to-chip liquid cooling.
- Note
- More than 90% of the capacity was committed before launch, and the site takes Nxera's Singapore total to 120 MW, per the same report. Its design PUE is 1.25. The report does not state what the megawatts count.
Evidence and delivery dependencies
- Metric-level verification not recorded
- Full-build power basis not stated
Diligence sequence: power agreement → load connection → permits → equipment → building → fit-out → commissioning. Completion of each dependency is unverified unless the linked evidence explicitly establishes it.
Sources
- Capacity — Nxera opens 58MW AI-ready data centre in Singapore · reportingPublished: 2026-02-09 · Effective: not specified · Source checked: 2026-11-24 · Next review: 2026-12-24
What changed
No changes recorded since November 24, 2026.
First recorded on November 24, 2026. "Recorded" is the day a change was entered here, not the day it happened. Tracked: name, tenant, status, capacity and what it counts, and stated investment. Changes to other fields, such as sources, timing and power, are not listed.